Include storage after supply
Describe the protected storage available and the time before loading. Timber can become wet after drying, so the supply criterion should be supported by handling and storage controls. Avoid promising permanent freedom from mould based solely on a kiln-dried description or one moisture reading.
Details to check for your enquiry
- Agreed moisture acceptance
- Measurement method and timing
- Storage and inspection arrangements

Photograph from our supplied pallet and packaging collection. Confirm the specification and availability for your order.
Reference guidance
IPPC: ISPM15 and adopted standards. Check current requirements for the actual goods, route and workplace before shipment or use.
